Rugged Robotics is the trusted layout partner for data center builders — accelerating installation and eliminating rework at hyperscale speed.

The project

Hensel Phelps, a top-tier mission-critical general contractor was selected to build a hyperscale data center more than two hours outside a major metro. With a high-pressure schedule, a limited labor pool, and thousands of features supporting future GPU installations, they needed a full-service partner that could deliver speed, precision, and repeatability at scale.

Key Outcomes

  • Rugged freed up more than 750 hours of physically demanding layout work, allowing those resources to be reallocated.
  • Framers installed 15%+ faster due to Rugged printing additional detail compared to traditional methods (e.g. door ID, swing/frame, ceiling height).
  • Rugged helped streamline coordinated QA/QC process, including verification in minutes that 100% of slab penetrations were within the wall track.

The challenge

Hensel Phelps was concerned that the traditional layout methods would have stressed overextended trades that would have led to errors, rework, or worse, safety incidents, given the aggressive schedule.

While they knew automated layout would improve productivity, the project team didn’t have the bandwidth to take on new responsibilities of leasing equipment, training staff to operate it, or managing execution onsite. They couldn’t afford the distraction of troubleshooting or underutilized tech. What they needed was a plug-and-play solution that just worked and showed up when and where they needed it.

The solution

Hensel Phelps was drawn to Rugged’s full-service approach combining robots, field support, and model processing all bundled into a white glove service. Rugged deployed multiple robots accompanied by seasoned operators across 5 deployments to lay out racking baseplates, anchor locations, wall track, HVAC passthroughs, and various other architectural and engineering features across 250K+ square feet.

Layouts were validated by trades at every stage, streamlining QA/QC. For example, the project team was able to confirm within minutes that the MEP sleeves aligned perfectly with the wall layout and 100% of the slab penetrations were within the wall track, a first for the project manager.

Rugged’s impact was felt across the site: over 750 hours of strenuous (hands and knees) labor was reduced and repurposed, and framing installation sped up by more than 15%, both reducing hard labor hours and the associated risk of injuries. Looking ahead, Hensel Phelps is already exploring how to capture additional benefits from automated layout, including expanding Rugged’s services to include the MEP layout on the next building.

AUTOMATE.
ACCELERATE.
DOMINATE.

Leave manual methods in the past and let Rugged Robotics modernize your layout processes. No more crawling around snapping lines—just pinpoint precision, detailed information, and expedited results.